Canyon

NEW 12 Foot Black Handset Cord Avaya 9600 9500 9400 Series IP Phone w/ Long Lead

Description: Brand New 12 Foot Black Handset Curly Cord for Avaya 9600 IP, 9500 & 9400 Digital Series Phones 9608, 9610, 9620, 9620C, 9621G, 9630, 9630G, 9640, 9640G, 9650, 9650C, 9508, 9504, 9404, 9408 *Cord length is 12 feet fully stretched, and approximately 22 inches coiled. Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely utilized at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (36 inches coiled / unstretched) If you have any questions at all regarding features, functionality, compatibility or condition of the equipment in this auction, please contact us.

Price: 7.99 USD

Location: Lexington, Kentucky

End Time: 2024-03-17T18:10:06.000Z

Shipping Cost: 0 USD

Product Images

NEW 12 Foot Black Handset Cord Avaya 9600 9500 9400 Series IP Phone w/ Long Lead

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Buyer

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Brand: The VoIP Lounge

MPN: Does Not Apply

Recommended

The Voip Lounge HD Voice Handset with Curly Cord for Polycom VVX Series IP Phone
The Voip Lounge HD Voice Handset with Curly Cord for Polycom VVX Series IP Phone

$34.18

View Details
10-Pack NEW 12 Ft Handset Receiver Curly Cord Cisco 7900 Series Phone Gray
10-Pack NEW 12 Ft Handset Receiver Curly Cord Cisco 7900 Series Phone Gray

$65.00

View Details
The VoIP Lounge Replacement HD Voice Handset for Polycom VVX 250/350 / 450 IP Bu
The VoIP Lounge Replacement HD Voice Handset for Polycom VVX 250/350 / 450 IP Bu

$30.75

View Details
NEW 48V Power Supply for Cisco 8800 9900 IP Phone 9951 9971 8961 CP-PWR-CUBE-4
NEW 48V Power Supply for Cisco 8800 9900 IP Phone 9951 9971 8961 CP-PWR-CUBE-4

$34.99

View Details
NEW Handset Receiver for Cisco 8961 VoIP IP Phone Black CP-8900-MHS-CG
NEW Handset Receiver for Cisco 8961 VoIP IP Phone Black CP-8900-MHS-CG

$12.99

View Details
NEW 48V Power Supply for Cisco 7800 Series IP Phone w/ power cord CP-PWR-CUBE-3
NEW 48V Power Supply for Cisco 7800 Series IP Phone w/ power cord CP-PWR-CUBE-3

$23.99

View Details
NEW 48V Power Supply for Mitel 6900 6800 6700 Series IP Phone w/ power cord
NEW 48V Power Supply for Mitel 6900 6800 6700 Series IP Phone w/ power cord

$23.99

View Details
The VoIP Lounge Phone Handset Receiver Curly Coil Cord Gloss Black Long 25-Foot
The VoIP Lounge Phone Handset Receiver Curly Coil Cord Gloss Black Long 25-Foot

$8.38

View Details
5-Pack NEW 48V Power Supply for Nortel Avaya IP Phone 1120E 1140E 1220 1230 1210
5-Pack NEW 48V Power Supply for Nortel Avaya IP Phone 1120E 1140E 1220 1230 1210

$119.00

View Details
NEW Push To Talk Handset w/ curly cord for Cisco 7800 & 8800 Series IP Phone PTT
NEW Push To Talk Handset w/ curly cord for Cisco 7800 & 8800 Series IP Phone PTT

$37.99

View Details